Why does factory layout planning in existing halls fail on outdated drawings?
In brownfield planning, a new line, a relocation of equipment or an extension is planned for a hall that has been in production and changing for years. The basis is often the drawing from the last retrofit. What has happened since appears in no document: relocated equipment, pipes and cable trays installed later, new racking, fences and enclosures.
Anyone who plans a 3D layout on this basis is planning against a picture that is no longer correct. The usual answer is to re-measure on site with a tape measure or laser distance meter, one question and one spot at a time. That costs time, ties up staff in the hall and yields individual measurements instead of a coherent picture. A laser scan ordered once solves the problem only until the next change.
Typical gaps when planning a re-layout in an existing hall:
- The drawing shows the state of the last retrofit, not the state of today.
- Changes to equipment, utilities and installations are not consistently documented.
- Every new question triggers another round of measuring.
- A scan captured once goes out of date with the next layout change.
What changes with current as-built data for factory planning?
A point cloud represents the geometry of a hall as a large number of measured points: floor, walls, roof, equipment, utility lines and installations. With LYTHEON it is created on demand, without a separate survey order. The scanners of LYTHEON One are permanently mounted on the hall ceiling, one click in LYTHEON Forge starts them all at the same time, and after 15 seconds the entire hall is captured. Forge merges the captures into one point cloud and stores it as a dated state. This can be repeated at any time without a survey appointment. Your operations choose the time. How 3D scanning of a factory hall works in detail is described on a separate page.
This means the as-built survey of production can be repeated in every planning phase. The table shows where a fresh scan helps in each phase.
| Phase | Key question | Where a fresh scan helps |
|---|---|---|
| As-built capture | What is really in the hall? | The as-built survey is produced with one click instead of as a separate survey order. |
| Concept | Does the new line fit into the available space? | Options are sketched on the actual as-built state, not on the drawings from the last retrofit. |
| Detailed planning | Where is there room for equipment, routes and access? | Dimensions can be checked on the point cloud instead of re-measuring on site. |
| Clash detection | Does the new equipment clash with the existing installation? | The equipment model is checked against the current scan, not against an old drawing. |
| Implementation | Has anything changed since planning? | A scan immediately before work starts provides the state on which work actually takes place. |
| Acceptance and documentation | What does the hall look like after the retrofit? | A scan after completion records the as-built condition as a dated state. |
- Blue: Equipment and machinery
- Purple: Platforms and stairs
- Brown: Racking
- Yellow: Crane systems
- Green: Building services (MEP)
- Beige: Hall floor
- 12Blue numbered marker: Ceiling scanners
- Blue line: Cable routes
How does clash detection for new equipment work against the current scan?
In planning, new equipment usually exists as a 3D model or as a plant layout drawing. Clash detection asks whether it really has room at the intended position: relative to existing equipment, columns, utility routes, ventilation ducts and racking. If the check is made against the drawing, deviations between drawing and hall come to light only when the equipment is brought in or installed. If it is made against the current scan, the basis is the hall as it looks today.
The check is not only about the equipment itself. Maintenance zones, access, transport routes for bringing it in and utility connections also belong in the check. The point cloud serves as the basis against which your planning team checks its equipment models in its own planning environment. The same applies to pipes, ventilation ducts and cable trays. You can find more under Fab & utility planning.
The film shows what this looks like: read the clear height at any point directly from the scan and spot bottlenecks before the machine is on the forklift. Hide the upper levels and what remains is your current machine layout.
How accurate is the data?
For clearances and margins, accuracy is what counts. LYTHEON uses the Livox Mid-360S. Manufacturer specification per sensor: range precision ≤ 2 cm at 10 m (1σ) and angular precision < 0.15° (1σ), all values in the manufacturer’s datasheet. The accuracy of the merged hall scan also depends on layout and installation.
Coverage is part of this too: ceiling scanners see what lies in their line of sight, and behind large equipment the point cloud can have gaps. That is why our Synthetic Engine simulates your hall in advance and defines the number and position of the scanners. If needed, we also survey your hall once on site.
How do dated states document a retrofit or re-layout?
Every scan is stored in Forge as a dated state. For a retrofit, this means one state immediately before the work begins and one after completion. Both points in time are then backed by measurement data. This helps with the handover between planning, site management and maintenance, and with the acceptance.
Open space and circulation areas can also be viewed in the current state, for example whether a planned equipment layout touches an escape route. The assessment against the applicable regulations remains with your specialists. The point cloud supplies the geometry for it.
Factory planning during ongoing operation: when does a fresh scan pay off?
Current 3D as-built data pays off whenever something is to change in a hall that is in production. Typical triggers:
- A new line or new equipment that has to fit into existing structures
- Equipment relocation and other re-layouts in production
- Extension of production onto areas previously used for other purposes
- Hall retrofit involving work on utilities, roof or column grid
- Review of safety and escape routes after a reconfiguration
- New utility routing for pipes, ventilation and cables
In factory planning during ongoing operation in particular, it matters that capturing the hall does not hold up the process. The scanners hang from the ceiling, a scan takes 15 seconds, and operations decide when it happens. This makes it possible to capture the same hall several times during a project.
Is this already a digital twin of the factory?
No. LYTHEON provides current as-built data as a foundation: a point cloud of your hall that can be refreshed at any time. A digital twin of the factory additionally needs a maintained model, equipment and operating data, and clear responsibilities. The point cloud is a solid starting point for this, because it shows the hall as it is and not as it was once planned.
We are developing the next step with LYTHEON Core: a local AI computer for scan-to-BIM that is intended to derive BIM models from the scans while the data stays in the plant network. Core is in development and is not yet available. You can find further answers in the frequently asked questions.
How does LYTHEON get into your hall?
The process has three steps, and a contact person accompanies you throughout:
- Simulation: Our Synthetic Engine simulates your hall in advance and defines the number and position of the scanners. You receive initial simulation data and a fixed price for the implementation.
- Installation and setup: LMS mounts the scanners and sets up Forge, once.
- Scan and plan: One click starts every scanner. After 15 seconds the hall is captured, and your planning builds on the current as-built state.