Fab and utility planning with a current 3D scan

Fab and utility planning means planning equipment and utilities on the actual as-built state. With a current 3D scan of your hall, you see existing pipes, ducts and cable trays before new utilities are routed. This applies especially to semiconductor, optics and electronics manufacturing and other plants with dense building services.

What do fab planning and utility planning mean?

Fab and utility planning covers two tasks that are closely linked in a manufacturing plant. Fab planning plans the production floor: where does each piece of equipment stand, how does material flow, and where is there room for a fab expansion? Utility planning plans the supply: which utilities does the equipment need, and on which routes do they get there?

Depending on the plant, utilities include, for example, power, cooling water, compressed air, exhaust air and process media. They often run as overhead services in the ceiling area above the equipment, in the form of pipes, ducts and cable trays. The tool hook-up is the connection of a machine or piece of equipment to these utilities. The basis of every utility plan in manufacturing is a reliable MEP as-built survey, that is, a record of the existing building services.

Why does the as-built state of utilities and routes keep changing?

New equipment is added, lines are moved, utilities are retrofitted or rerouted. Not every one of these changes ends up completely in the drawings. The denser the building services, the larger the gap between drawing and reality tends to be. Typical causes:

  • Conversions and retrofits that are not fed back into the as-built drawings
  • Temporary fixes and interim solutions that become permanent
  • Changes by different trades at different times
  • Fab expansion and retrofit during operation, where new utilities have to find room between existing routes

The routes change along with the layout. How the two work together in planning is described in Factory layout planning with current scan data.

What risks arise when utility routing is based on outdated drawings?

If new utility routes are planned on an outdated state, the consequences often show only when construction begins:

  • Clashes with existing routes: A new pipe or duct crosses a line that is not shown in the drawing.
  • Rework on site: Routes have to be replanned on the spot, with consequences for material, installation and schedule.
  • Coordination effort between trades: Without a shared, current basis, each trade has its own picture of the existing state.
  • Interventions during operation: Every correction on site affects the production around it.

A conventional survey with tripods and barriers is hard to repeat before every planning round in ongoing production. That is why it is often commissioned once and becomes outdated with the next change. How the common methods differ is shown in the comparison of laser scanning methods.

How does a current 3D scan help with utility planning using LYTHEON?

LYTHEON consists of LYTHEON One, the scanning system, and LYTHEON Forge, the platform. Proven 3D scanners hang permanently from your hall ceiling. One click in Forge starts all scanners at once, and after 15 seconds the hall is captured, as far as it lies in the line of sight of the scanners. Forge merges the captures into one point cloud. The home page explains how the system is built. For utility planning, this means:

  • A fresh scan before every planning round: Your team plans on today’s state, not on the state of the last conversion.
  • Clash detection against the current state: You check new equipment and routes against the current scan in advance, before anything is built.
  • Dated states as documentation: Forge stores every scan as a dated state. This lets you show how routes and equipment looked at a given point in time, for example before a conversion.
  • Scanning during operation: You choose the time yourself, for instance at a shift change. No tripods or barriers are needed in the production areas.
Top view of the point cloud of a production hall including the ceiling area, coloured by object class: building services in green and pipes above the equipment in blue, plus ceiling scanners and cable routes to the network cabinet
  • Green: Building services (MEP)
  • Light blue: Pipework
  • Blue: Equipment and machinery
  • Brown: Racking
  • Yellow: Crane systems
  • Beige: Hall floor
  • Blue numbered marker: Ceiling scanners
  • Blue line: Cable routes
Example: top view including the ceiling area, coloured by object class. Building services such as ventilation and routes run together with the pipes above the equipment. The point cloud shows the visible geometry, not what lies behind cladding.

The film shows what this looks like on screen: see pipes, ducts and cable trays overhead at a glance. Read the clear height at any point directly from the scan and spot bottlenecks before the machine is on the forklift.

From the film “LYTHEON in 90 seconds”, chapter 04: fab & utility planning. Example hall with simulated data, with music. Watch the whole film

How does utility planning with a 3D scan work?

  1. Simulation: Our in-house Synthetic Engine simulates your hall in advance and defines the number and position of the scanners, with the aim of covering the hall as well as possible. You receive initial simulation data and a fixed price for the implementation. If needed, we survey the hall on site once.
  2. Installation and setup: LMS mounts the scanners at the simulated positions and sets up Forge for your hall. This happens once.
  3. Scan and plan: One click creates a new state. The next planning round starts from this state.

Design, installation, software and training come from a single source, and you have one point of contact. You can find more about the process from simulation to scan on the home page. The basics of scanning an entire hall are explained in 3D scanning of factory halls.

What can the point cloud do, and where are its limits?

What you can read from the point cloud

  • Route and height of visible pipes, ducts and cable trays
  • Distances between routes, equipment and building structure
  • Free space in the ceiling area above the equipment where new routes might fit

Where the limits lie

A scanner only sees what lies in its line of sight. From the ceiling position, that is the hall seen from above. What is hidden, it does not capture.

AreaIn the scan
Exposed pipes, ducts and cable traysCaptured, as far as they lie in the line of sight of a scanner
Equipment and structures in the hallCaptured, as far as visible. Shadow areas are possible behind large structures
Areas above suspended ceilingsNot captured
Behind cladding and in shaftsNot captured
Lines routed in the floor or wallsNot captured

The simulation with the Synthetic Engine serves to find positions that cover the visible hall as well as possible. Areas that none of the scanners can see are not captured, however well the scanner positions are planned. For such areas you still need your existing documents and, if necessary, an inspection on site. Further limits:

  • The point cloud shows geometry, not content. Which medium flows in a line, and what nominal diameter or pressure it has, cannot be read from it. This assignment stays in your documentation.
  • Very dark or highly reflective surfaces can affect the measurement.
  • The design of the utilities, structural analysis and fire protection remain the task of specialist engineering. The scan provides the geometric basis for this work.
  • For areas with special cleanliness or protection requirements, we make no blanket statement on suitability. We clarify this case by case together with you.

How accurate is the scan?

We use the Livox Mid-360S. Manufacturer specifications per sensor:

  • Range precision ≤ 2 cm at a distance of 10 m (1σ)
  • Angular precision < 0.15° (1σ)
  • Detection range 40 m at 10% reflectivity (typical value)
  • Field of view 360° horizontal × 59° vertical

These values apply to a single sensor. The accuracy of the merged hall scan also depends on layout and installation. The full datasheet from the manufacturer (opens in a new tab) is available online.

What will LYTHEON Core mean for utility planning?

We are developing LYTHEON Core, a local AI computer for scan-to-BIM. It is intended to derive BIM models from your scans, and your data stays inside your plant network. Core is in development and not yet available. If you would like to be informed about availability, note this in your request. You will find short answers in the frequently asked questions on the home page.

FAQ

Questions about fab and utility planning

What is utility planning in manufacturing?

Utility planning is the planning of how a manufacturing plant is supplied with utilities such as power, cooling water, compressed air or exhaust air. It includes the routes for pipes, ducts and cables as well as the tool hook-up, that is, the connection of new equipment to these utilities. It works best on a current as-built state.

How can existing utility routes be captured?

Often by 3D laser scan, which records the visible geometry as a point cloud. With LYTHEON, the scanners hang permanently from the hall ceiling, one click starts them all at once, and after 15 seconds the hall is captured, as far as it lies in the line of sight of the scanners. Hidden areas are not captured by the scan.

Does the scan also capture areas above suspended ceilings?

No. A scanner only captures what lies in its line of sight. Areas above suspended ceilings, behind cladding or in shafts stay hidden. The simulation with our Synthetic Engine serves to position the scanners so that the visible hall is covered as well as possible.

Can I scan during operation?

The scanners hang permanently from the ceiling. No tripods or barriers are needed. A scan takes 15 seconds, and you choose the time yourself, for example at a shift change. This way, even for a retrofit during operation, you can capture a new state before every planning round.

How accurate is a 3D scan for utility planning?

Manufacturer specification per sensor (Livox Mid-360S): range precision ≤ 2 cm at a distance of 10 m (1σ), angular precision below 0.15° (1σ). The accuracy of the merged hall scan also depends on layout and installation. The design of the utilities themselves remains the task of specialist engineering.

Plan utilities on the current as-built state.